Project Description
This bridge had severe spalling at the waterline. Two contractors had previously attempted to effect the repairs using form and pump methods which were singularly ineffective. CGCC offered the FLDOT a 3 year “no crack” guarantee as enticement to attempt a shotcrete rehabilitation. As of 2010, it has been 5 years without a call-back. 5000 psi, silica-fume enhanced, polypropylene fiber reinforced, prebagged mix was used on this project due to access limitations.