This bridge had severe spalling at the waterline. Two contractors had previously attempted to effect the repairs using form and pump methods which were singularly ineffective. CGCC offered the FLDOT a 3 year “no crack” guarantee as enticement to attempt a shotcrete rehabilitation. As of 2010, it has been 5 years without a call-back. 5000 [...]
Outer Banks, North Carolina – Herbert C. Bonner Bridge Rehabilitation
Bridges & Piers
Coastal Gunite 2015-03-05T17:32:20-05:00In 1986, CGCC performed extensive repairs to the Bonner Bridge and satisfied the NC Department of Transportation’s requirement for an additional 5 years of life for the bridge. Twenty years later, CGCC was back again to do 7 times the original amount of repairs to the bridge, and it is significant to note that all [...]